You hired a builder in Portugal to build or renovate a house, often in the Algarve, and the work is late, unfinished or full of defects: cracks, leaks, damp or poor installations. Portuguese law gives the owner the right to have defects removed, a lower price, termination and damages, but only within strict time limits. Which limits apply depends on whether you contracted as a consumer with a professional and when the contract was signed.

Describe your case

Reviewed on

Short answer

  1. Written report of the defects
  2. Demand to remove the defects
  3. Price reduction, termination or damages

The solution is a timely written defect report to the builder, a demand for repair and, failing that, a lower price, termination or damages. A Portuguese lawyer secures the evidence and deadlines; you find one on LawBridge.

Describe your case

Quick answers

How long is a builder liable for defects in Portugal?
It depends on who you are and when you signed. A consumer dealing with a professional under a contract from 1 January 2022 can have ten years for structural and five years for other defects, with three years to act after notifying the defect. Otherwise the Civil Code gives five years from handover, a report within one year of discovery and a claim in the following year.
How quickly must I report a defect?
Under the Civil Code the general rule for construction contracts is 30 days from discovery and one year for houses and other buildings. Under the consumer regime the three-year period to act runs from the notification. Reporting in writing straight away is the safest course.
The builder is months late. What can I do?
A lawyer checks the agreed schedule and any penalty clause, sets a final deadline and assesses termination and damages.

When this situation arises

  • Your new villa in the Algarve is months behind schedule and the builder keeps asking for more money
  • The renovation is finished but there are leaks, cracks or damp
  • The builder stopped coming after the last payment
  • You bought a house from the person who built it and defects appear
  • You live abroad and cannot check the site yourself

What options do you have

Formal report and demand

The lawyer reports the defects in writing within the deadline and demands that the builder remove them or redo the work.

Expert inspection

The lawyer arranges an independent technical expert to document the defects, their cause and the cost of repair.

Price reduction, termination or damages

If the builder does not fix the defects, the lawyer claims a lower price, ends the contract where the work is unfit for its purpose, and claims damages.

Ending the contract early

The owner can withdraw from the contract at any time but must compensate the builder; the lawyer weighs this against termination for breach.

Recommended step-by-step process

  1. 1.

    The lawyer determines which rules apply

    Whether you contracted as a consumer with a professional and when the contract was signed, then the budget, schedule, specifications, changes and payments against the work done.

  2. 2.

    The lawyer secures the deadlines

    Records when each defect was discovered and makes sure the reports and the claim are made in time.

  3. 3.

    The lawyer documents the defects

    Photos, an expert report and, where needed, a joint inspection with the builder.

  4. 4.

    The lawyer negotiates or goes to court

    Seeks repair or a settlement with the builder and, if that fails, brings the claim in a Portuguese court.

What documents to prepare

  • Building contract, budget and schedule
  • Plans, licence and specifications
  • Payment receipts and invoices
  • Photos and videos of the defects with dates
  • Messages and e-mails with the builder

Common mistakes

  • Reporting defects only by phone, or later than the Civil Code allows where it applies: 30 days, or one year for buildings
  • Accepting the work without noting visible defects
  • Paying the final instalment before the defects are fixed
  • Hiring another firm to repair before the defects are documented
  • Letting the claim period pass: under the Civil Code one year after the report for buildings, under the consumer regime three years after notifying the defect

Risks and important deadlines

Lost rights

Under the Civil Code, defects not reported within 30 days of discovery, or within one year for buildings, cost the owner the right to removal, price reduction, termination and damages. Under the consumer regime these rights lapse three years after the defect was notified.

Liability periods for buildings

Under the Civil Code defects in a house must appear within five years of handover; under the consumer regime within ten years for structural elements and five for other defects. After that the builder is no longer liable under these rules.

Accepted defects

Under the Civil Code, accepting the work without reservation while knowing of the defects releases the builder from liability for them. Under the consumer regime, a defect is excluded if the consumer knew of it, or could not reasonably ignore it, when the contract was concluded, or if it results from materials the consumer supplied; taking over the house does not by itself end the consumer's rights.

Builder disappears

If the firm closes or becomes insolvent, recovering money becomes harder the longer you wait.

Estimated costs

The lawyer's fee is agreed in advance, often as a fixed fee for the demand and an hourly rate or fixed fee for court proceedings. An expert report is paid separately.

When it's worth contacting a lawyer

Contact a lawyer in Portugal as soon as you discover defects or the builder stops work, and before you pay the final instalment or accept the work. A Portuguese lawyer makes sure the defects are reported in time, arranges an expert, negotiates with the builder and represents you in court if you live abroad. LawBridge is a lawyer search engine: you find a lawyer in Portugal, describe your situation in a Standard request and the lawyer contacts you. A lawyer's work is always paid; you agree the fee with them in advance.

No need to call around.

  • Describe what happened, confidentially and in a few minutes.
  • We approach suitable lawyers on your behalf.
  • Lawyers who accept the case contact you themselves, and you decide who to work with.
Describe your case

Frequently asked questions

Can I stop paying?

Withholding payments can be justified, but it can also put you in breach. A lawyer checks the contract and the work done first.

I bought the house from the person who built it. Does this apply?

Yes. Under the Civil Code the five-year rule also covers a seller who built, altered or repaired the property. If the seller is a professional and you bought as a consumer from 1 January 2022, the longer consumer periods can apply instead.